Client

Urban Redevelopment Authority

Project Completion

Feb 2021

Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

To provide better connectivity between the new neighbourhood and upcoming Lentor MRT Station, a 1.25-km road network was developed in the area of Yio Chu Kang Road and Lentor Drive.

Further to the establishment of road network, this project also involved the preparation works of 25-ha land, construction of 2.6-km drains with the width ranging from 0.75 m to 2.80 m, installation of 1.05-km sewer pipelines and other associated roadside facilities.

The project team took the initiative to work closely with other government agencies to resolve any potential maintenance issue and to make provisions for succeeding development with advanced construction. For instances, proposing to replace rigid pavement with semi-rigid pavement at junction for the ease of accessing to the existing underground water pipelines, embedding reserved pipe sleeves beneath the box drain at every land parcel for future connections of sewer pipelines and profiling suitable terrain for the erection of bus stops in time to come.

Special Feature

  • Adopting tunnel boring method for jacking of pipelines, minimising disruptions to the public.
  • Building the sewer manhole with 12-m circular vortex drop, reducing effect of falling flow.
  • Introducing "Bobcat-friendly” drainage grating, allowing the use of mechanical mean to clean the drainage system.
24C-Photo-Gallery URA Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

Installing semi–rigid pavement at junction for easy access to underground pipelines

24D-Photo-Gallery URA Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

Fitting "Bobcat-friendly” drainage grating for maintenance purposes

24E-Photo-Gallery URA Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

Jacking of pipelines for speedy construction and minimising disruptions to public

24F-Photo-Gallery URA Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

Erection of sewer manhole with 12-m circular vortex drop to reduce effect of failing flow

24G-Photo-Gallery URA Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

Making provisions for the construction of bus stops with bays in the future

24H-Photo-Gallery URA Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

Using sand patch method to determine surface texture depth of semi-rigid pavement

24I-Photo-Gallery URA Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

Evaluating riding quality of flexible pavement with walking profiler

24J-Photo-Gallery URA Contract 2 – Proposed Roads, Drains, Sewers & Related Ancillary Works at Yio Chu Kang Road / Lentor Drive Area

Commissioning of street lightings for new carriageways

Apply now

  • Error, form does not exist or is not published.

Get in touch