Client

JTC Corporation

Project Completion

Jun 2021

Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

To facilitate the redevelopment of Terusan and Pesawat Industrial Estate, the road network and drainage system in the vicinity have been reconfigured with new construction.

Constituting part of the preparatory works for the redevelopment plan, the existing 15m-wide canal was diverted to make way for resizing of land plots into regular shape. In conjunction, three new reinforced concrete box culverts were constructed across this canal to aid traffic flow. During the diversion works, temporary tidal control gates were designed and implemented to prolong the working window for the building of outfall structures which was subjected to tidal influence and ingress of sea water.

In addition, a new Exit 15A was constructed along the Ayer Raja Expressway (AYE) to improve the connectivity of these industrial estates. To better serve the prospective tenants, other civil works have also been completed, including the development of four new dual 2-lane and one new dual 1-lane roads, widening of three existing road networks, enhancement of drainage system as well as the installation of pipelines for the sewerage system, supply of NEWater and potable water.

To sum up, earthworks were carried out to profile the land plots in accordance with the finishing level and alignment as per requirements.

25C-Photo-Gallery JTC - Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

Activation of tidal control gates during the construction of outfall structures

25D-Photo-Gallery JTC - Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

Erection of 23m-wide laced strutting earth retaining stabilising structure for canal diversion

25E-Photo-Gallery JTC - Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

Propping utility pipelines during the construction of reinforced concrete box culvert

25F-Photo-Gallery JTC - Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

Diversion of 15m-wide canal

25G-Photo-Gallery JTC - Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

Completion of one of the three reinforced concrete box culverts

25H-Photo-Gallery JTC - Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

Jacking pipelines for NEWater supply

25I-Photo-Gallery JTC - Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

Milling and paving of existing AYE in conjunction with the construction of new AYE Exit 15A at Jalan Terusan

25J-Photo-Gallery JTC - Construction of Roads, Drains, Sewers & Canal Diversion including Ancillary Works at Terusan & Pesawat Industrial Estate

Establishment of new dual 2-lane carriageways to facilitate the redevelopment of Pesawat Industrial Estate

Apply now

  • Error, form does not exist or is not published.

Get in touch